Ourten Solution Help to Upgrade 128 Cameras' Hospital CCTV System within One Week!
Healthcare

Hospital CCTV Upgrad.png


Overview

Shanghai Songjiang First Hospital needed to upgrade its existing CCTV system with 128 cameras to achieve network-based management, aiming to strengthen safety and security for doctors and patients across several locations including wards, corridors, and main entrances.

The hospital administration initially expressed concerns about potential disruptions to patient care and rest, and the complexity of operating the new system. After consultation with system integrators and contractors, the hospital contacted Ourten for solution testing and evaluation.


Challenges

The hospital detailed its concerns as follows:

● Lengthy Construction Period:

Existing pipeline infrastructure could not support extensive re-cabling, potentially prolonging construction time.

● Noise Disruptions:

Construction-related noise could disturb patient recovery, leading to increased patient complaints.

● Large Coverage Area:

Hospital management was concerned about incomplete network coverage due to the extensive area.


Solution

After comparing various re-cabling options, Ourten's OT-PLC101-N Ethernet Extender solution was selected due to its convenience and cost-effectiveness. Specific benefits included:

● No Re-cabling Required:

Shortened construction timeline significantly.

● Minimal Construction Noise:

Reduced noise pollution, meeting environmental standards and minimizing patient disruption.

● Extensive Communication Bandwidth:

Met the requirement for network coverage over a 1km distance, ensuring full network coverage throughout the facility.


Results

By deploying Ourten OT-PLC101-N Ethernet Extender, the hospital successfully addressed the significant construction challenges and minimized disruptions to medical staff and patients. The network upgrade was completed in just one week, greatly reducing construction impact and receiving positive feedback from both hospital administration and patients.